100 General Provisions
Item Title Item  Title
  Foreword 106 Control of the Materials
  Introduction to Construction Inspection 107 Legal Relations and Responsibility to Public
  General Documentation Requirements 108 Prosecution and Progress
101 Definitions and Terms 109 Method of Measurement and Payment
105 Control of the Work    
 
200 Earthwork
Item Title Item  Title
201 Clearing and Grubbing 206 Chemically Stabilized Subgrade
202 Removal of Structures and Obstructions 207 Temporary Sediment and Erosion Controls
203 Roadway Excavation and Embankment 208 Rock Blasting
204 Subgrade Compaction and Proof Rolling 209 Linear Grading
205 Chemically Stabilized Embankment    
 
250 Pavement Repairs
Item Title Item  Title
251 Partial Depth Repair 255 Full Depth Pavement Removal and Rigid Replacment
252 Full Depth Rigid Pavement Removal and Flexible Replacement 256 Bonded Patching of PCC Pavement
253 Pavement Repair 257 Diamond Grinding Portland Cement Concrete Pavement
254 Pavement Planning 258 Dowel Bar Retrofit
 
300 Bases
Item Title Item  Title
301 Asphalt Concrete Base 308 Asphalt Treated Free Draining Base
302 Asphalt Concrete Base 320 Rubblize and Roll
304 Aggregate Base 321 Cracking and Seating Existing Plain Concrete Pavement
305 Portland Cement Concrete Base    
 
400 Flexible Pavement
Item Title Item  Title
401 Asphalt Concrete Pavements - General 422 Chip Seal with Polymer Binder
407 Tack Coat 423 Crack Sealing, Hot Applied
408 Prime Coat 424 Fine Graded Polymer Asphalt Concrete
409 Sawing and Sealing Asphalt Concrete Pavement Joints 442 Superpave Asphalt Concrete
410 Traffic Compacted Surface 446 Asphalt Concrete
411 Stabilized Crushed Aggregate 448 Asphalt Concrete
421 Microsurfacing    
 
450 Rigid Pavement
Item Title Item  Title
451 Reinforced Portland Cement Concrete Pavement 499 Concrete - General
452 Non-Reinforced Portland Cement Concrete Pavement    
 
500 Structures
Item Title Item  Title
501 Structures General 513 Structural Steel
502 Structures for Maintaining Traffic 514 Field Painting of Structural Steel
503 Excavation for Structures 515 Prestressed Concrete Members
504 Sheet Piling Left in Place 516 Expansion & Contraction Joints, Joint Sealers and Bearing Devices
505 Pile Driving Equipment Mobilization 517 Railings
506 Static Load Test 518 Drainage of Structures
507 Bearing Piles 519 Patching of Concrete Structures
508 Falsework and Forms 520 Pneumatically Placed Mortar
509 Reinforcing Steel 522 Sectional Corrugated Metal Arch Structures
510 Dowel Holes 523 Dynamic Load Test
511 Concrete for Structures 524 Drilled Shafts
512 Treating Concrete 526 Approach Slabs
 
600 Incidentals
Item Title Item  Title
603 Pipe Culverts, Sewers, and Drains 620 Delineators
604 Manholes, Catch Basins, Inlets, Inspection Wells, Junction Chambers, Precast Reinforced Concrete Outlets, or Monuments 621 Raised Pavement Markers (RPM)
605 Underdrains 622 Concrete Barrier
606 Guardrail 624 Mobilization
607 Fence 625 Highway Lighting
610 Cellular Retaining Walls 626 Barrier Reflectors
613 Low Strength Mortar Backfill 630 Traffic Signs and Sign Supports
614 Maintaining Traffic 631 Sign Lighting
615 Roads and Pavements for Maintaning Traffic 632 Traffic Signals 
616 Dust Control 633 Signal Controllers
617 Reconditioning Shoulders 638 Water Mains and Service Branches
618 Rumble Strips on Shoulders    
 
640 Pavement Markings 
Item Title Item  Title
641 Pavement Markings - General 645 Preformed Pavement Marking
642 Traffic Paint 646 Epoxy Pavement Marking
643 Polyester Pavement Marking 647 Heat-Fused Preformed Thermoplastic Pavement Marking
644 Thermoplastic Pavement Marking    
 
650 Roadsides
Item Title Item  Title
652 Placing Stockpiled Topsoil 660 Sodding
653 Topsoil 661 Planting Trees, Shrubs, and Vines
656 Roadside Cleanup 662 Landscape Watering
657 Riprap for Tree Aeration 666 Pruning Existing Trees
658 Tree Root Protection 670 Erosion Protection
659 Seeding and Mulching 671 Temporary Erosion Control Mats
 
SS-840, 850, 851, and S-1015
Item Title Item  Title
SS-840 Mechanically Stabilized Earth (MSE) Walls 851 Asphalt Treated Free Draining Base
850 Cement Treated Free Draining Base S-1015 Compaction Testing for Unbound Materials